Kitchen Remodel Timeline: What to Expect Week by Week
One of the most stressful parts of a kitchen remodel is not knowing how long you'll be without a kitchen. Every project is different, but here's a realistic week-by-week look at how a typical Treasure Coast kitchen remodel unfolds.

Before week 1: design and ordering
The biggest hidden part of the timeline happens before demo. Cabinets, countertops, and specialty materials can take weeks to arrive. Good contractors order everything and confirm it's in before swinging a hammer — because starting demo with materials still on order is how kitchens sit unfinished.
Week 1: demolition and rough-in
Out with the old. Cabinets, counters, and sometimes flooring come out. If plumbing or electrical is moving, the rough-in work happens now, followed by inspections.
Week 2: walls, floors, and prep
Drywall repairs, any wall changes, and flooring go in. This is when the shape of the new kitchen starts to appear.
Week 3: cabinets and countertops
Cabinets are installed and leveled, then countertops are measured (templated) and fabricated. Note: stone countertops are often templated after cabinets are in, then fabricated off-site — a normal gap of several days to a couple of weeks depending on material.
Week 4: finishes and final details
Backsplash, fixtures, sink, appliances, hardware, and paint touch-ups. Then a final walkthrough to catch anything that needs fixing.
What causes delays (and how to avoid them)
Material lead times — order early; this is the #1 cause of delays.
Hidden issues — older homes reveal surprises behind the walls.
Change orders — deciding to move something mid-project resets parts of the schedule. Choosing your materials early and sticking with the plan keeps things moving.
Frequently Asked Questions
How long does a kitchen remodel take? Most take around 4–8 weeks of active work, plus lead time for ordering cabinets and countertops beforehand.
Why is there a gap after cabinets before countertops? Stone countertops are templated after cabinets are installed, then fabricated off-site — a normal delay of several days to a couple of weeks.
What causes kitchen remodel delays? Most often material lead times, hidden issues in older homes, and mid-project change orders.